Odd numbered Side of Street (Robinson Rd West to Ellerdale St)

The Brisbane City Council wishes to advise that construction of concrete footpath works will be conducted in your street.  The works will be carried out by civil contractor M & J Keogh Pty Ltd. Work is expected to begin on or about Monday 17 July, 2017, with completion anticipated to be within three (3) weeks of commencement.

Temporary inconveniences you are likely to experience during these works include:

  • Restricted access to footpaths;
  • Limited vehicular access to property;
  • Equipment and materials stored on the roadway and footpath during the project;
  • Noise from machinery; and
  • Dust from the works.

Council and Contractor personnel will endeavour to minimise the inconvenience caused to you as a result of his work and will consult with you in advance if vehicular access to your property is to be directly affected.

Any tree branches or shrubs that interfere with the construction and/or pedestrian access for the new footpath will be trimmed by Council as a part of these works.

Hours of work will generally be Monday to Saturday between 7am & 5pm; however work outside these hours may be necessary at times.

Your cooperation during this period is valued.  Should you have any concerns regarding these works, please contact one of the following:

Brisbane City Council Call Centre
3403 8888